Contents
PAGE
Use of Guidance 3
The Requirements 5
Section 0: Performance 8
Performance standards 8
Section 1: Pre-completion testing 12
Introduction 12
Grouping 12
Sub grouping for new buildings 12
Sub grouping for material change of use 13
Sets of tests in dwelling-houses
(including bungalows) 13
Sets of tests in flats with separating floors
but without separating walls 13
Sets of tests in flats with a separating floor
and a separating wall 13
Types of rooms for testing 13
Sets of tests in rooms for residential
purposes 13
Properties sold before fitting-out 13
Normal programme of testing 14
Action following a failed set of tests 14
Remedial treatment 14
Material change of use 14
Approved manner of recording
pre-completion testing results 14
Section 2: Separating walls and
associated flanking constructions
for new buildings 16
Introduction 16
Junctions between separating elements
and other building elements 16
Mass per unit area of walls 17
Plasterboard linings on separating and
external masonry walls 17
Cavity widths in separating cavity masonry walls 17
Wall ties in separating and external cavity masonry walls 17
Corridor walls and doors 18
Refuse chutes 18
Wall type 1: Solid masonry 18
Junction requirements for wall type 1 20
Wall type 2: Cavity masonry 24
Junction requirements for wall type 2 26
Wall type 3: Masonry between independent panels 29
Junction requirements for wall type 3 32
Wall type 4: Framed walls with absorbent material 35
Junction requirements for wall type 4 36
Section 3: Separating floors and
associated flanking constructions
for new buildings 38
Introduction 38
Junctions between separating floors and
other building elements 38
Beam and block floors 39
Mass per unit area of floors 39
Ceiling treatments 39
Floor type 1: Concrete base with ceiling
and soft floor covering 40
Junction requirements for floor type 1 41
Floor type 2: Concrete base with ceiling and floating floor 44
Floating floors (floating layers and resilient layers) 45
Junction requirements for floor type 2 47
Floor type 3: Timber frame base with ceiling and platform floor 49
Junction requirements for floor type 3 50
Section 4: Dwelling-houses and flats
formed by material change of use 53
Introduction 53
Work to existing construction 54
Corridor walls and doors 54
Wall treatment 1: Independent panel(s) with absorbent material 55
Floor treatment 1: Independent ceiling with absorbent material 56
Floor treatment 2: Platform floor with
absorbent material 57
Approved Document E Resistance to the passage of sound 1